Projects
- 16th Avenue Sewer Trunk Rehabilitation Project – Region of York – City of Markham, 2,800mm Diameter, 1.5 Km long.
- Record thickness of geopolymer lining applied during the rehabilitation on pipe walls. The pipe scan was performed at full length of the tunnel and was superposed to compare the final diameter of the pipe against the original. The scan was checked with a core sample at a specific location resulting in the confirmation of the scanned thickness.
- West Humber River Culvert – City of Toronto – Etobicoke, Corrugated Steel Oval Culvert 1.85m X 2.50 m, 160 m Long
- Rehabilitation project of a steel culvert by the application of Geopolymer lining. Determination of wall thickness and total volume of material applied on the culvert walls.